午夜香吻高清观看视频在线,色吊丝av中文字幕,少妇厨房愉情理伦bd在线观看,仙踪林果冻传媒一区二区,天堂www在线资源天堂在线

試聽導(dǎo)航

牽引繩的安裝解說詞

  • 編輯:配音云
  • 分類:配音資訊
  • 瀏覽次數(shù):978
  • 發(fā)布時間:2020-06-19 06:24:05
  • 分享到:

配音云為您推薦一篇解說詞,這篇文案是由配音云老師傾心演繹。如有配音需要請聯(lián)系QQ:327468121?或者致電配音熱線:13568829740
Traction rope installation Truncation rope Clean spacious place open rope, wire rope inspection should be no dead corner, rust, broken wires situation. After determining the length of rope, from the mouth from the cut ends of the wire rope 5mm at 0.7 ~ 1mm of lead wire lashing into 15mm width Lead wire bundling ensure tight tight Then stay out of the rope in the cone length Z, then banding requirements, and then cut off the rope Making rope Filled rope noose law making The rope ends truncated cone penetration, will chop mouth lashing lead wire removed, loosen the strands, remove hemp core strand will clean Bend back the required size, good will bend strands pull into the taper sleeve, under the mouth with asbestos rope or cotton Sizha strict, with 350 ° pour babbitt Watering should rope before drogue internal oily debris clean, take a slow approach to make drogue heating temperature reaches about 100 ℃; remove surface impurities babbitt watering, watering must be completed, tap the rope when watering so babbitt irrigation real, immovable after filling before cooling. Self-locking wedge rope noose law making Rope penetration sleeve, back bends, leaving enough of the arc and then penetrate into the wedge sleeve from the front, the arc of the wedge into the rope, the wedge introduced drogue When one end of the rope to expose approximately 80mm, with a lead wire rope and the rope body bundled together, pull the rope until the cotter pin hole on the exposed wedge sleeve so far. In the wedge into the cotter pin hole. Install rope trolley After one side of the rope to do, beginning around the wire rope to bypass the traction sheave, steering wheel into the hoistway, bypassing to return sheave, pull up to the room, through the rope plate, fixed rope. The other side of the rope through the hole into the room reserved for the well, bypassing jiaoding return sheave in the production car top rope, pulled up to the room, through the rope plate, fixed rope In the same manner a few other rope hanging around. All rope installed, and the weight of the car plus the weight of the whole. After completion of the rope hanging around, each application segment rope folded back at least three groups of locking wire rope clips, The distance from the top rope clip the bottom of the wedge should be less than 25mm, the distance between each two rope clips not less than 6 times the diameter of the rope, you must force the side plate in the rope In order to prevent twisting of the rope shall be not less than 6mm diameter rope to tie around each sleeve rope between each other up In order to prevent twisting of the rope shall be not less than 6mm diameter rope to tie around each sleeve rope between each other up Rope and the inner wall of the gap between the protection units are 20 ~ 40mm. Rope tension adjustment Method One: If you previously had to pick all the springs, the spring of the same panel of highly consistent rope, wire rope tension adjustment, as long as the measurement of the height adjustment rope spring, make it consistent. Its high degree of error can not be greater than 2mm. Method Two: In the stairwell 3/4 height, with 100 ~ 150N spring balance each rope pulled laterally same distance, their mutual tension difference should not exceed 5%, and adjusted if insufficient. Adjustment of the rope to be complete, the entire run 10 times (up and down), and then follow the "rope tension adjustment" approach rope tension retest, if it reaches the error standard, that the adjustment is completed, if the error does not meet the standard, continue to follow the "rope tension adjustment "adjustment method. Mounting clips rope For turbo worm host to install rope clip Remove the cover, turn the screw reset, under the pressure of the sliding shaft to lock the angle, and remove even the arm, remove the brake plate. The clip is mounted on the mount rope, the rope clamp assembly is mounted in the load-bearing beam, adjust the position, in line with the manufacturers standards, drilling into the spring pin, install the brake plate, installation and even arm, mechanical trigger, connection security loop, checking, reset, and put on the cover.
? ?

免責(zé)聲明: 以上整理自互聯(lián)網(wǎng),與本站無關(guān)。其原創(chuàng)性以及文中陳述文字和內(nèi)容未經(jīng)本站證實,對本文以及其中全部或者部分內(nèi)容、文字的真實性、完整性、及時性本站不作任何保證或承諾,請讀者僅作參考,并請自行核實相關(guān)內(nèi)容。(我們重在分享,尊重原創(chuàng),如有侵權(quán)請聯(lián)系在線客服在24小時內(nèi)刪除)

聯(lián)系客服 立即下單

樣音推薦 更多
1 男1_專題_人物專題配音_講述 男1-大氣專題 509 0.3萬 收藏 下單
2 男1_專題_企業(yè)專題_區(qū)塊鏈類配音_科技 男1-大氣專題 477 922 收藏 下單
3 男1_專題_企業(yè)專題_山東華油新能源公司配音_大氣 男1-大氣專題 464 498 收藏 下單
4 男1_專題_企業(yè)專題_珍珠配音_激情 男1-大氣專題 504 410 收藏 下單
5 男1_專題_企業(yè)專題_美業(yè)舒緩感配音_優(yōu)雅 男1-大氣專題 448 336 收藏 下單
6 男1_專題_企業(yè)專題_鉆石配音_神秘 男1-大氣專題 424 288 收藏 下單
7 男1_專題_企業(yè)專題_鞍山解說配音_大氣 男1-大氣專題 463 251 收藏 下單
8 男1_專題_企業(yè)專題_高速公路配音_沉穩(wěn) 男1-大氣專題 454 225 收藏 下單
9 男1_專題_黨建政府_臨港經(jīng)濟開發(fā)區(qū)配音_成熟 男1-大氣專題 441 217 收藏 下單
10 男1_專題_醫(yī)院專題_中醫(yī)藥類配音_舒緩 男1-大氣專題 448 271 收藏 下單

配音咨詢

客服-婷婷 客服-露露 客服-歐陽 客服-薇薇
返回頂部