午夜香吻高清观看视频在线,色吊丝av中文字幕,少妇厨房愉情理伦bd在线观看,仙踪林果冻传媒一区二区,天堂www在线资源天堂在线

試聽導(dǎo)航

安裝要求說(shuō)明解說(shuō)詞

  • 編輯:配音云
  • 分類:配音資訊
  • 瀏覽次數(shù):809
  • 發(fā)布時(shí)間:2020-06-19 06:24:06
  • 分享到:

配音云為您推薦一篇解說(shuō)詞,這篇文案是由配音云老師傾心演繹。如有配音需要請(qǐng)聯(lián)系QQ:327468121?或者致電配音熱線:13568829740
Installation and the baseline model Hangings Scaffolding erection requirements Scaffold platform located in the highest point of the hoistway ceiling at 1.5 ~ 1.7m Erection of scaffolding must not interfere with the position of the sample line placement, rail and heavy frame mounting; Scaffolding is best to use the top of the riser four short tube. After removal of the short tube, the remaining vertices riser bracket should be at the highest level at 500mm below in order to install the car. Scaffolding calandria span to 1.4 ~ 1.7m is appropriate, should be installed between the two tranches of a horizontal tube gear cross tube, easy to climb up and down. Tingmen each bracket below 200 ~ 400mm should be located at a horizontal tube gear At least two-thirds of each scaffold scaffold board shop Both ends of the scaffold boards stuck exhaust pipe 150 ~ 200mm, with a lead wire to # 8 with the exhaust pipe fastened. Scaffolding should be safe and sound, its carrying capacity of not less than 2500 N / m Scaffolding must go through security inspection technology sector, after acceptance, before use. Erection of model planes If the shaft wall of concrete structures in the shaft at about 1m below the roof, with expansion bolts M16 will be firmly fixed angle horizontal shaft wall Each two anteroposterior direction The two 100 × 100mm square wooden longitudinal direction, respectively, on the angle. Square solid wood ends should be leveling pad Measurement error model rack level is not greater than 3/1000. Fixed template frame ends. Model in place, hanging baseline Model of four smooth, straight. By drawing assembly. Marked on the centerline of the car model finished stitching, door Jingkuan line, the center line of the car guide rail, heavy rail centerline, the centerline of the weight, the final review of each diagonal size are equal, and the first half of the car distance from the car to the counterweight guide rails center distance, deviation is less than 0.5mm; and glued firmly. The model in place. Measuring the level of the model in the whole plane is not more than 3mm. In the top of the hoistway door kind of put two layers line, two-line distance to take the door clear width. Layer by layer measuring wells, wells and sample line to the anterior wall of the distance to meet the requirements. Each floor measuring data and records. According to the measurement results before and after adjustment model planes around, and make the kind of line and side walls meet the requirements of manufacturers. Determine the hoistway centerline, the centerline of the car and the counterweight centerline. In the model at the end of the wire hanging a light object, order slowly down to the bottomless pit. Vertical line in the middle is not in contact with the scaffolding or other objects, and do not have to make wire knot phenomenon. In line at the point of discharge, with a blade or electric knife, draw a vertical saw -V-shaped small groove so that the V-shaped groove for actinomycetes vertex point, the line into, to prevent errors caused by shifting baselines; and put a line at specify the name of this line, the end line fastened to the fixed nails. After the pit line put in the end, with the line fall when replacing actinomycetes hanging objects, any of its natural vertical stationary. Such as stroke or high wind, the line still is not easy to fall, Can put a bucket in the pit, the barrel into the right amount of water or oil, The lines fall into the barrel, increasing its swing resistance, as soon as possible so that the line still falling Baseline will be fixed on a stationary steady line wire rack, Then check the fixed point and put the line ministries size, whether the deviation diagonal size, etc., after determining correct before proceeding to the next process.
? ?

免責(zé)聲明: 以上整理自互聯(lián)網(wǎng),與本站無(wú)關(guān)。其原創(chuàng)性以及文中陳述文字和內(nèi)容未經(jīng)本站證實(shí),對(duì)本文以及其中全部或者部分內(nèi)容、文字的真實(shí)性、完整性、及時(shí)性本站不作任何保證或承諾,請(qǐng)讀者僅作參考,并請(qǐng)自行核實(shí)相關(guān)內(nèi)容。(我們重在分享,尊重原創(chuàng),如有侵權(quán)請(qǐng)聯(lián)系在線客服在24小時(shí)內(nèi)刪除)

聯(lián)系客服 立即下單

樣音推薦 更多
1 男1_專題_人物專題配音_講述 男1-大氣專題 517 0.3萬(wàn) 收藏 下單
2 男1_專題_企業(yè)專題_區(qū)塊鏈類配音_科技 男1-大氣專題 480 926 收藏 下單
3 男1_專題_企業(yè)專題_山東華油新能源公司配音_大氣 男1-大氣專題 471 498 收藏 下單
4 男1_專題_企業(yè)專題_珍珠配音_激情 男1-大氣專題 512 411 收藏 下單
5 男1_專題_企業(yè)專題_美業(yè)舒緩感配音_優(yōu)雅 男1-大氣專題 451 337 收藏 下單
6 男1_專題_企業(yè)專題_鉆石配音_神秘 男1-大氣專題 429 292 收藏 下單
7 男1_專題_企業(yè)專題_鞍山解說(shuō)配音_大氣 男1-大氣專題 469 252 收藏 下單
8 男1_專題_企業(yè)專題_高速公路配音_沉穩(wěn) 男1-大氣專題 465 226 收藏 下單
9 男1_專題_黨建政府_臨港經(jīng)濟(jì)開發(fā)區(qū)配音_成熟 男1-大氣專題 453 217 收藏 下單
10 男1_專題_醫(yī)院專題_中醫(yī)藥類配音_舒緩 男1-大氣專題 452 271 收藏 下單

配音咨詢

客服-露露 客服-婷婷 客服-薇薇 客服-歐陽(yáng)
返回頂部